Now 25 years old the fruit cage was starting to collapse
and we decided as part of its renovations we would take the opportunity
of building some walls, inside the fruit cage they would be warm and
sunny, outside cool and shady and we hope an ideal location for some
of the National collection of Lapageria to be planted out. Click on
pictures to enlarge them - use back button to return
We decided to tackle the West facing wall first as it
was this side of the cage that was in the worst condition
The newly finished wall, the horizontal wires are run
through loops of galvanized wire laid between the course as the wall
was built.
January 08 the wall had a range of plants tried on it that we had
previously struggled to get through the winter. Below are some
pictures of these taken in December 08 about 11 months on