| The 4" tantalized wooden posts of the original failed for the 3rd time in 25 years, time for a rethink! | |
|
Remains of the old wooden structure can be seen at the far end, the plants were laid on the ground and work went on around them, Re-enforced concrete cores were built in situ |
![]() |
The concrete pavers were built around the cores which had of course been made the correct size to make this easy |
![]() |
The top was fitted over the post tops and jointed dry, tantalized timber and quite chunky, by mid summer it was hard to see it hard been touched |
![]() |
|